Skip to content
2701 Del Paso Rd, Suite 13066 · Sacramento, CA 95835
business@mavcodeconstruction.com Mon–Fri 7:00–5:00 PT
November 17, 2008

Palo Alto

This Project was a pool demolition job located in Palo Alto, California. The entire pool was demolished then all of the gunite (concrete) was removed and sent to a recycling facility in Redwood City, CA. The concrete was then crushed and reused as recycled baserock. The rebar (metal rod) was removed and shipped to a recycling facility in Redwood City, CA.

Next step

Have a project in mind?

Tell us the basics and we'll respond the next business day with a free estimate.

Get a Free Quote (650) 787-3366

Free demolition quote in one business day

Tell us the basics - project type, location, timeline - and we'll come back with a real estimate, not a sales pitch. No obligation.